December 9th, 2025
On 11th December 2024, the EMR Delivery Body released the registers detailing the prequalification status of every unit that applied to take part in two capacity market auctions scheduled to be held in March 2025.
Prequalified and conditionally prequalified derated capacity by generation Type for T-4 auctions:
2028-2029 T-4 auction:
2028-29 T-4 auction battery prequalified and conditionally prequalified capacity:
2027-28 T-4 auction battery prequalified capacity:
Prequalified and conditionally prequalified gas-fired derated generation capacity for recent T-4 auctions:
2028-29 T-4 auction:
Prequalified and conditionally prequalified derated capacity by generation type for T-1 auctions:
Prequalified and conditionally prequalified gas-fired derated generation capacity for rent T-1 auctions:
2025-26 T-1 auction battery prequalified capacity:
Make better decisions with all the data you need to analyse European energy markets